EAGLE SCOUT | YEAR | PROJECT |
---|---|---|
George Meadows | 1932 | |
Joseph Bank | 1933 | |
Wallace Barrows | 1933 | |
John Barrow | 1935 | |
Herbert Higginbothan | 1940 | |
Irving Rice | 1940 | |
Charles Soule | 1940 | |
Edward Swenson | 1947 | |
John Daniell | 1968 | |
Stephen Daniell | 1969 | |
Richard Gustafson | 1969 | |
David Marshall | 1969 | |
Dana Daniell | 1971 | |
Alan Jensen | 1973 | |
Eric Rachdorf | 1988 | |
Michael Edwards | 1990 | |
Kenneth Blowers | 1992 | Conservation Land – cleanup of trails |
Robert Carbone | 1992 | Paint and Repair Lower Room at St. Thomas Church |
Robert Montiero | 1992 | Picnic Area at Congregational Church |
Paul Rich | 1992 | Drop ceilings and painting lower level of Congregational Church |
Gregory Anderson | 1995 | New bridge, and trail cleanup behind Wilmington Health Center |
Steven Bodoin | 1995 | Cement shed at Camp 40 Acres |
Jason Mainini | 1995 | Enclose oil and propane tanks at Methodist Church, outline parking area |
Nicholas Montalto | 1995 | Paint Episcopal Church on Forest Street |
James Whitebone | 1995 | Pet food section at Wilmington Food Pantry |
Benjamin DeGennaro | 1998 | Computerize WIlmington High School Library |
Christian Ferraro | 1998 | Built campsite with lean to at Camp 40 Acres |
Eric Brassil | 1999 | Built shed at Congregational Church |
Paul Cheney | 1999 | Repair and repaint dugouts at Rotary Park |
Michael Corcoran | 2000 | Layout of trails with maps at Camp 40 Acres |
Daniel Cheney | 2001 | Wilderness campsite at Camp 40 Acres |
Jeffrey Stokes | 2001 | Shed at Methodist Church |
Jason Gustin | 2002 | Outdoor Chapel at Episcopal Church on Forest Street |
Roman Walsh | 2002 | Cleanup and draw map of old town cemetary |
Buck Collings | 2003 | Water station at Camp 40 Acres |
Anthony Crupi | 2003 | Cabin at Camp 40 Acres |
Alexander Stevenson | 2003 | Collection of sporting goods for Nicaragua |
Steven Higgins | 2004 | Tewksbury Hospital bridge |
Christopher McGrath | 2004 | Conservation land bridge and trail |
Nicholas Gustin | 2005 | Playground at St. Elizabeth’s Episcopal Church on Forest Street |
Ken Aruda | 2005 | Liberty Bog Trail |
Michael Golden | 2006 | Hut at Camp 40 Acres |
Nathan Mercer | 2008 | Vernal Pond Locations |
Nicholas Farnsworth | 2007 | Volleyball Court at Camp 40 Acres |
Kevin Martin | 2007 | Shelves at Project in Lowell |
William Starratt | 2008 | Veteran’s graves in cemetary |
Thomas Barry | 2008 | Gates and sign at Camp 40 Acres |
Nicholas Monteforte | 2008 | Walkway at Harden Tavern |
Ryan Breslin | 2008 | Remodel Villanova Hall downstairs |
Martin Sabounjian | 2008 | Trail at Town Park with kiosk |
Russell MacDonald | 2009 | Campsite at Camp 40 Acres |
Michael Sheerin | 2009 | Shed at Mason Lodge |
Joshua Weaver | 2009 | Paint Villanova Hall top floor |
Nathan Harvey | 2010 | Bridge and path at West Intermediate School |
Jimmy Johnston | 2010 | Harden Tavern Carriage House remodel |
Will MacKinnon | 2011 | The Bookstore Next Door shed |
Daniel Robinson | 2011 | Villanova Hall kitchen remodel |
John Keating | 2011 | Wilmington Food Pantry building renovations |
Chris Monteforte | 2011 | New front walk, fence and stair repair at Harnden Tavern |
Mark Aruda | 2012 | Painted sanctuary at Abundant Life Church |
Peter Warren | 2012 | Customized Pod and cleaned out basement at Buzzell Senior Center |
Adam Maienza | 2012 | Cleared walking path behind Harnden Tavern |
Pat MacCorkle | 2012 | Repaired and stained fence at Baldwin House |
Jonathan MacKinnon | 2013 | Built a prayer garden at the Wilmington United Methodist Church |
Stan Dancewicz | 2013 | St. Dorothy’s Cleanup and Flower garden |
Jared Lloyd | 2013 | Built info kiosk and bridge at Camp 40 Acres |
Scott Robinson | 2014 | Repaired and painted handicap ramp at St. Thomas Church |
Zachery Tingdahl | 2014 | Built shed for Wilmington Masons |
Chris Maienza | 2015 | Reinforced fence at Abundant Life Church |
Dan Bell | 2015 | Built shelving at The Mission of Deeds |
Michael Dancewicz | 2015 | Built a shed at the Buzzell Senior Center |
Kevin Richardson | 2015 | Built covered entrance for handicap access at Congregational Church |
Mason Ouellette | 2016 | Renovated Snack Shack at Villanova Youth Center |
Joshua Fitzler | 2016 | Renovated basement rooms at St. Thomas Church |
David Robie | 2016 | Renovated Fellowship Hall at the United Methodist Church |
Jeremy Tingdahl | 2017 | Built shed at the United Methodist Church |
Tim Comeau | 2017 | Renovated stage in Fellowship Hall at the United Methodist Church |
Joseph Anthony Maselli | 2018 | Hosted a Christmas party for the children of the Boston Childrens hospital recovery wing, and purchased DVD players for the hospital rooms with the leftover funds |
James George Ward III | 2018 | Built a retaining wall at the Abundant Life School |
Daniel Maienza | 2018 | Refurbished, created, and marked trails in Wilmington Town Forest |
Ryan Murphy | 2019 | Updated and revitalized the basement kitchen at St. Thomas of Assisi Church |
John Bumpus | 2019 | Refurbished Buzzell Senior Center Activity Room |
Adam Kulis | 2019 | Created recruitment video for Wilmington Youth Center |
Mark Ragucci | 2019 | |
Joseph Consorti | 2019 | Revitalized Fellowship Hall at Wilmington United Methodist Church |
Joseph Lydon | 2019 | Created video training for altar servers at the Parish of the Transfiguration |
Shaun Bradford | 2020 | Built bridge over wetlands in Wilmington Town Forest |
Sukethram Sivakumar | 2020 | Purchased and installed bleeding control trauma kits for Wilmington High School and created video training |
David Woltag | 2020 | Revitalized the Buzzell Senior Center Bocce Court |
Liam Prigmore | 2020 | Created memorial to honor Wilmington residents who were Killed In Action |
Sean Lydon | 2021 | Built sheds for generator and dry storage at Camp 40 Acres |
Colton Sullivan | 2021 | Built storage at Eliot Church and St. Paul’s Soup Kitchen and improved lighting |
Nick Toth | 2021 | Restored and renovated courtyard at Wilmington United Methodist Church |
Hayden Kane | 2021 | Made blankets for St. Paul’s Soup Kitchen |
Matthew DeSario | 2021 | Created face mask and care packages for Wilmington elderly and school staff |
Anthony Prezioso | 2021 | Built and distributed beds to fight child bedlessness for Sleep in Heavenly Peace |
Joshua Tompkins | 2022 | Installed new wireless network in Saint Francis Church in Dracut |
Ryan Whiteman | 2022 | Renovated Blanchard Road Conservation Area Trail |
Daniel Epie | 2022 | Made disaster relief kits for UMCOR’s outreach committee |
Kevin Stevens | 2022 | A tribute to Leslie W. Wicks |
Zack Weinstein | 2022 | Project Recess Backpacks |
Tyler Sheehan | 2022 | Trail Construction – Lt. Buck Drive Trail Loop |
Liam Lydon | 2023 | St. Thomas Sunday School Sound System Installation |
Noah Carriere | 2023 | Wildwood Cemetery Veterans’ Cross Installation |
Brayden Gorski | 2023 | Bringing Baseball to Africa |
John Consorti | 2023 | Flag Retirement Boxes |
Adam Yalcin | 2023 | Charging Up the Church! |
Evan Woltag | 2024 | Wilmington “Hidden Wounds” Veterans Memorial |
Tyler Kaszuba | 2024 | Holiday Party for AdviniaCare Nursing Home |